VDC SUMMARY exterior

Six Prefab Concrete Cabins Pop Up in the Foothills of Portugal

3 of 19

All components were prefabricated in a factory and quickly assembled on-site. The system "performs at once as structure, insulation, and cladding elements," says Gonçalves. The assembly process took eight months in total.