Exterior, Concrete Siding Material, Stucco Siding Material, Sawtooth RoofLine, and House Building Type A shift of 1 meter back to the 2m building set-back line, in the upper levels, to regain the otherwise reduced building footprint resulted in the Strategy of GAPS.  Photo 12 of 35 in Project #5 by Studio Wills + Architects

Project #5

12 of 35

A shift of 1 meter back to the 2m building set-back line, in the upper levels, to regain the otherwise reduced building footprint resulted in the Strategy of GAPS.