Project posted by TEAM BLDG
Night view
Night view
Apartment buildings at dusk in a city of tall buildings
Apartment buildings at dusk in a city of tall buildings
Building façade after the renovation
Building façade after the renovation
Most of the surrounding buildings are the matchbox type corridor houses
Most of the surrounding buildings are the matchbox type corridor houses
New building and old street
New building and old street
夕阳中的公寓楼
夕阳中的公寓楼
East facade
East facade
The only market in the urban village is just behind the building
The only market in the urban village is just behind the building
The only market in the urban village is just behind the building
The only market in the urban village is just behind the building
The new building and the old building
The new building and the old building
Lighted apartment building at dusk
Lighted apartment building at dusk
The buildings of different ages form a dialogue in style
The buildings of different ages form a dialogue in style
Facades of old and new buildings
Facades of old and new buildings
The rhythm of the facade can be seen from the sidewalk
The rhythm of the facade can be seen from the sidewalk
The rhythm of the facade can be seen from the sidewalk
The rhythm of the facade can be seen from the sidewalk
The lighting effect of the facade
The lighting effect of the facade
"Light" façade material
"Light" façade material
The public space surrounded by the main three-dimensional dynamic lines of the original building
The public space surrounded by the main three-dimensional dynamic lines of the original building
The public space surrounded by the main three-dimensional dynamic lines of the original building
The public space surrounded by the main three-dimensional dynamic lines of the original building

14 more photos

Credits

Posted by

From TEAM BLDG

Function: Apartment
Design Period: 2018.07-2019.02

Construction Period: 2019.02-2019.10

Location: Yuexiu, Guangzhou, China

Building Area: 6000SQM

Architects: Xiao Lei, Shigeno Yuji, Yang Yuqiong, Wang Zipeng, Cao Yi, Pedro Manzano Ruiz

Type: Architecture and Interior

Status: Completed

Photographs: Jonathan Leijonhufvud

The renovation of old buildings has always been a project type that we are particularly interested in - it is often complicated on both the physical and the spiritual levels, with limits in structure, specifications and costs and other aspects; but at the same time, it is also particularly real and vivid, with a unique personality and contradictions, waiting for architects to understand and solve. Just like the reconstruction project of Guangzhou Wuyang residential building that we had integrated design in architecture, interior and landscape.

Bustling urban village
As the central urban area with the smallest area and the highest population density in downtown Guangzhou, Yuexiu district still has a lot of urban villages, remnant areas slightly disjointed with the high-speed urbanization. The renovation project this time is located in a well-known urban village at the Siyou Second Road in Yuexiu District.

The residential buildings in the urban village are basically the matchbox type corridor houses built in the 1950s and 1960s. In order to meet the actual use needs, there are many additions and structures at the façade and inside of the building. With its excellent downtown location and convenient transportation environment, this area is populated by a large number of young office workers, with a very high population density. Therefore, it is faced with the urgent need to improve the quality of the community and the living environment.

The residential building to be renovated this time is located at a very special position, with a bustling urban trunk road in front and the Siyou meat and vegetable market, the only market in the urban village. The stores necessary for life, such as food, groceries and hardware, stand in the market. Nearby, there are two other residential buildings with very similar interior structure. The unique texture of the bustling and noisy urban village was our first impression when we just arrived at the base.

The owner hopes that through the transformation of the facade, we can get rid of the old and dirty impression of the urban village and establish the benchmark image of the long-rented apartment brand. Meanwhile, it is hoped to improve the internal space, so that the apartment will not only meet the living comfort, but also make use of the public space to carry out activities and enhance neighborhood interaction.

“Lose weight” of new language of facade
As the front connecting the city with the urban village, how the transformed facade increases the degree of integration to link with the city and maintain cohesion with the community is one of the key demands for the facade reconstruction.

We studied and communicated about the punching method and proportion of the aluminum plate on the facade. After repeated proofing and confirmation, we chose the wavy punching aluminum plate to wrap the façade extending from the two ends of the atrium to the exterior. We strived to echo the punching pattern with the splicing mosaic of original building facade, to "reduce the weight" of the entire building through the semi-transparent covering layer and lighting setting, and meet the heavy traffic outside the house by the lightsome "rhythm" and jumping volume division.

The "dialogue" with the original buildings in the urban village behind also highlighted the contrast between the new and old languages, and the symbiosis with the surrounding buildings of big and small sizes emphasized the sense of "collage" of the texture level of the city facade.

Corridor “cuts” public and private secrets
The site is made full use in the interior of the building to make the staggered-floor corridor, and the east and west end of the corridor are connected with two staircases, which met the functional needs of small family settlement in the village at that time. However, there are a large number of structures in the inner courtyard surrounded by residents from the north and south and the air conditioning machines and wire chimneys that are scattered at random, which makes the only open public space in the original building unusually dirty and disorderly and there is even serious rat infestation in the courtyard.

Therefore, the main part of the internal reconstruction of the building should be the public space part in the yard and the rationale for re-dividing the house type is also the design point that we should focus on.

The design starts with the central courtyard to clean the original structures in the yard and sort out the air conditioning and various lines and pipes to ensure the courtyard's openness and comfort. According to local conditions, the public space surrounded by the main three-dimensional dynamic lines of the original building should be made full use of, to ensure that the lingering degree of the new residents in the central yard and staggered floor corridor by creating an interesting visual interior facade.

The design should keep the original structure of the building as much as possible and retain the three spatial levels from the private to the public areas in the original buildings, namely the connection of different house types at each floor, the three-dimensional enclosure of the staggered floor corridor and the staircase in front of houses, and convergence at the central courtyard. The interlayer between the skirt buildings along the street and the residents is filled with the gym, audio-visual rooms and other public spaces and the top terrace is set with sightseeing, drying and other recreational areas. At the entrance, the sightseeing elevator is added to reach each floor conveniently.

Difficulties and shortcomings
In the process of renovation, due to not repairing for longer time and disorderly pipeline, the setting of the upper and lower water buried pipes and the new firefighting pipeline inside the building became the biggest problem in the renovation. However, how to connect the pipeline setting in the urban village with the existing municipal pipeline was also reasonably solved through multi-party efforts and consultations.

In terms of materials, in order to meet the design requirements of low cost and high efficiency, we have chosen finished fabricated toilets and prefabricated building materials as much as possible, such as terrazzo floor tiles and dry hanging metal sheets.

Regrettably, due to the limitation of time and budget, the materials and details for the entrance of the facade and the public space were handled in a hurry. The materials for the man approachable dimension should be more approachable, and the detail processing for the handrails should better meet the actual functional requirements.