McGill 120 Apartment joinery

Photos

One of the biggest challenges was reinforcing and leveling the floors—which had a four-inch difference between the highest and lowest points—before pouring the concrete slab. The concrete floor runs through the entire apartment except the open shower room, which is tiled.