The Knoxville-based CEO of the Shelton Group commissioned Brandon Pace of Sanders Pace Architecture to construct this small prefab on a "funky piece of property" on Norris Lake, a man-made reservoir in Sharps Chapel, Tennessee. The prefabricated cedar panels arrived on-site with insect screens that attached to the steel structure, and the frame assembly was completed in just three days.