Collection by Emily Casebeer
Green
Redesigning the cramped bathroom was one of the project’s biggest challenges. The original space had small and dated bath fittings, as well as intrusive plumbing pipework. The entire bathroom was taken down to the studs and pipes were redirected. The chimney was removed from the adjacent bedroom, increasing the available interior space. The tile floor in the bathroom is the only new flooring in the entire house.